Syrah Resources Balama, Cabo Delgado
Balama, Mozambique13.35°S 38.62°E
computed criticality11/100
reading
≈40% of natural graphite supply outside China; force majeure Dec. 2024 – June 2025
2025Fault line
The main alternative outside China, the Balama mine was paralysed for eight months by post-electoral protests: force majeure from December 2024 to June 2025. The shutdown drove natural-graphite prices outside China up 15-20%. Diversification away from China still hinges on Mozambican political stability.
Actors
Syrah Resources (Melbourne)
US DFC (Washington, lender)
Feeds 1
Spherical graphite, Jixi, HeilongjiangCritical Metals↗Shocks endured