HBM Memory
Critical node· HBM Memory · Critical anchor

BESI, Duiven

Duiven, Netherlands51.94°N 6.02°E
computed criticality19/100
reading
≈67% of hybrid bonding equipment
2025
Fault line

When HBM stacking shifts from thermocompression to copper-to-copper hybrid bonding (HBM4E, 20 layers and up), the equipment bottleneck will move to a second Dutch monopoly, co-developed with Applied Materials. The Netherlands would then hold two successive chokeholds on the memory chain: lithography upstream, bonding downstream.

Actors
BE Semiconductor Industries (Duiven)
Applied Materials (Santa Clara)
SET (Saint-Jeoire)
Feeds 2
SK Hynix, IcheonHBM MemorySamsung, PyeongtaekHBM Memory
Sources